07771 649 612

joe@highlightplanning.co.uk

Llantrisant Recycling Centre

Consultation

.

Introduction

 

Thank you for visiting this pre-application consultation website for the proposed redevelopment and improvement works at Llantrisant Recycling Centre.


We value your feedback and invite you to review the details of the proposed development, which seeks to enhance the site’s operations, improve environmental performance, and strengthen its contribution to recycling and sustainability in Rhondda Cynon Taf (RCT).

 

About the Site

 

Llantrisant Recycling Centre is a key facility for Rhondda Cynon Taf, providing essential waste management and recycling services. The site is split into two areas:


  • Community Recycling Facility (southern section): Open to the public, this area allows residents to dispose of and recycle household waste.
  • Private Recycling Facility (northern section): This area is dedicated to the storage, sorting, and processing of recyclable materials, supporting the region’s circular economy and sustainability objectives.



The site is strategically located within the Llantrisant Business Park industrial estate, bordered by industrial units and the Royal Mint.



Development Proposals

 

The redevelopment aims to enhance the site’s functionality, environmental sustainability, and integration with the surrounding landscape. Key features include:


  • A new steel-framed structure will house recycling operations, improving material recovery rates, reducing environmental impacts, and streamlining processes.
  • A landscaped bund with extensive tree planting will screen the site, mitigate visual impacts, and create new habitats, achieving a biodiversity compensation ratio exceeding 3:1.
  • Rooftop solar panels will generate renewable energy, and rainwater harvesting systems will support fire suppression and dust mitigation.
  • Sustainable drainage (SuDS) features, including an attenuation pond, will manage surface water runoff and protect the nearby Nant Muchudd watercourse.


These enhancements align with national and local policy objectives to promote sustainable waste management, protect the environment, and contribute to the circular economy.


Key Benefits of the Development


The proposals deliver multiple community and environmental benefits, including:


  • Supporting RCT’s Recycling Targets: By improving processing efficiency and material recovery rates, the development will help RCT achieve its ambitious waste recycling and landfill reduction targets.
  • Environmental Improvements: The enclosed recycling operations will reduce noise, dust, and odour impacts, enhancing environmental performance.
  • Biodiversity Gains: Significant landscaping and planting will enhance biodiversity and integrate the site into its urban fringe surroundings.
  • Energy Efficiency: Renewable energy features and sustainable drainage systems contribute to a low-carbon, climate-resilient development.
  • Economic and Employment Benefits: The redevelopment supports local employment and strengthens the site’s role in the regional economy.


Technical Assessments


Comprehensive technical assessments have been undertaken to ensure the development meets high environmental, safety, and operational standards including:


  • Noise Impact Assessment: Demonstrates compliance with acceptable noise thresholds for neighbouring properties.
  • Air Quality and Dust Assessment: Confirms effective dust and odour suppression measures are in place.
  • Tree Survey, Landscape Planning and Appraisal: outlining the landscaping strategy and tree planting to enhance biodiversity whilst ensuring the proposals sit comfortably within their setting.
  • Coal Mining Risk Assessment: Confirms site safety and stability.
  • Drainage Strategy: Outlines sustainable drainage measures to manage surface water and protect the adjacent watercourse.


These assessments have informed the proposals and demonstrate the robust design and mitigation measures embedded, ensuring the development is environmentally sustainable and aligns with local and national planning policies.


Planning Policy Compliance


The development complies with key policies in the Rhondda Cynon Taf Local Development Plan (LDP), including:


  • Policy CS9: Supports waste management facilities serving regional needs.
  • Policy AW8: Enhances biodiversity and green infrastructure.
  • Policy AW12: Promotes renewable energy and sustainable practices.


The proposals also align with national policy objectives in Planning Policy Wales and Technical Advice Note 21: Waste, supporting sustainable waste management and environmental protection.

Consultation Documents


Planning Summary Document


Plans and Drawings:

AL(90)01 Location Plan

AL(90)02 Existing Site Plan

AL(0)01 Existing Sections Sheet 1

AL(0)02 Existing Sections Sheet 2

Existing and Proposed Biomass Unit Floorplan and Roofplan

Existing and Proposed Biomass Unit Elevations

Existing and Proposed Storage Unit Floorplan and Roofplan

Existing and Proposed Storage Unit Elevations

Existing and Proposed Storage Unit Elevations

Existing and Proposed Office Floorplan and Roofplan

Existing and Proposed Office Elevations

AL(90)10 Proposed Site Plan

AL(0)03 Proposed Sections Sheet 1

AL(0)04 Proposed Sections Sheet 2

AL(0)10 Proposed Floor Plan

AL(0)11 Proposed Roof Plan

AL(0)20 Proposed Elevations


Reports, Forms & Notices:

Waste, Planning, Design and Access Statement

Noise Impact Assessment

Air Quality and Dust Assessment

Preliminary Ecological Appraisal

Tree Survey and Tree Constraints Plan

Coal Mining Risk Assessment

Application Form

Notice under Article 2C and 2D


How to provide your Comments

 

We hope you support us in the development of this site. Please provide feedback via email or post at the address below:

 

joe@highlightplanning.co.uk

 

Highlight Planning

47 Elm Grove Road

Dinas Powys

CF64 4AB


We would welcome any comments you have on the consultation by  20th January 2025.

 

Comments and information received as part of this consultation will not be used for any purpose other than for consultation purposes relating to this potential development. Whilst your comments may be referred to within our submission as part of the planning application, names will be redacted from responses and we do not share any information provided with third parties outside of the project team and this process.


Share by: